Borlink™ LE0310-99
APPLICATION: LE0310-99 is used during start up of a triple-head line. It helps to use a non-peroxide-containing material until stable conditions are reached. The settings should be the same as for the peroxide containing compound.
一般属性
使用 Prospector 建立免費帳戶時,可造訪 Borlink™ LE0310-99 的完整資料表詳細資訊。您將找到有關物理、機械和硬度規格的完整資訊
Technical Datasheet (English)
下载文档加工
Find specific processing information for Borlink™ Crosslinkable Compound as well as general information for the 热塑性,未指定 generic family. 注册 或 登录 了解更多信息。